Click on photo to enlarge

Caretex Dye. The Gas company paid for 16% of the boiler and economizer.
Heat recovered piped to 5,000 gallon tank which is also heated with
(2)wh1900's

J.B. French Cleanerers piped heat reclaimer to 199,000 btu tin can water
heater tank, and just turned the water heater off, saving all of this
energy

An installation photo of ten (10) T6800LR model hot water boilers at Cal
State University Long Beach, Long Beach, CA

Gordon Biersch Brewing (bottling facility), San Jose, CA
(left to right): Steve Ocampo (San Jose Boiler, San Jose, CA),
Michael Doherty (Gordon Biersch), Tim Connolly (San Jose Boiler),
Tom Connolly (San Jose Boiler), Curt Brown (San Jose Boiler)
Job profile: (2) 115 H.P. high pressure
steam boilers, 84% efficiency, auto blowdown system